MARINE & COASTAL ENGINEERING

Jetty construction

Piled jetty and berthing structures for port, energy and marine access projects.

What is jetty construction?

Jetty construction is the design-coordination and construction of a fixed structure projecting from the shore into water, used for berthing vessels, loading/unloading cargo, or providing marine access. Jetties are typically supported on piled foundations designed to resist vertical loads, berthing impact and environmental loading from waves and current.

Engineering application

A jetty's substructure — piles, pile caps and bracing — must be engineered for the combination of dead load, live load, vessel berthing/mooring loads and environmental loading specific to the water body. Foundation type is selected based on seabed conditions and water depth.

Typical project types

  • Port and cargo-handling jetties
  • Energy-sector marine terminals
  • Passenger or light-craft jetties
  • Private waterfront access structures

Advantages of a piled jetty structure

  • Open-piled structures minimise obstruction to water flow and sediment transport compared with solid fill structures
  • Pile foundations can be engineered for a wide range of seabed and loading conditions
  • Modular construction can suit phased installation

Considerations

  • Marine works are tide- and weather-dependent, affecting programme
  • Environmental and regulatory approvals are typically required before works begin
  • Berthing and mooring loads must be confirmed with the vessel/operator

Construction methodology

  1. Marine mobilisation — plant delivered to site by barge or from an adjacent working platform
  2. Pile positions set out and piles installed (typically driven piles — see driven piling)
  3. Pile caps and deck structure formed and cast, or precast elements placed
  4. Fendering, bollards and mooring hardware installed
  5. Commissioning and handover

Equipment

[REPLACE WITH VERIFIED MARINE PLANT — BARGES, PILING RIGS, CRANES — USED FOR JETTY WORKS.] See equipment & capabilities.

Quality control & safety

[REPLACE WITH VERIFIED MARINE QA/QC AND WATER-SAFETY PROCEDURE.]

Project experience

[REPLACE WITH VERIFIED JETTY PROJECT EXAMPLES.] See the project database.

Jetty construction FAQ

How are jetty foundations constructed? +
Jetty foundations are typically constructed using driven piles installed from marine plant, supporting pile caps and a deck structure above water level. See driven piling.
What loads does a jetty need to be designed for? +
Jetty design accounts for dead and live load, vessel berthing and mooring loads, and environmental loading such as waves and current, in addition to standard structural loading.
How long does jetty construction take? +
Programme depends on jetty length, water depth, weather windows and approvals. [REPLACE WITH VERIFIED TYPICAL PROGRAMME RANGE.]

Let's discuss your project.

CallWhatsAppEnquire